Building Permit Requirements
|
The requirements for building permits differ based on the type of construction and proposed work. The following documents outline the requirements when applying for a building permit.
Minor Construction
|
|
Moderate Construction
|
|
Major Construction
|
|
|
Building Permit Applications & Standard Forms
|
To simplify the building permit process and help applicants submit a complete application the most common forms are provided below:
|
Building Permit Fees
|
List of fees for building and demolition permits. All building permit fees are outlined in Building By-law. Fees are exempt from HST. Fees are due at the time of submitting an application.
Section A: Construction of new buildings, additions to buildings, including mezzanines
|
Item
|
Occupancy Classification
|
Work Description
|
Multiplier
|
Flat Fee
|
1
|
Group A – Assembly
|
Shell Only(1)
|
$8.48
|
|
2
|
|
Complete Building (partitioned, finished, mezzanine)
|
$16.99
|
|
3
|
Group B – Institutional
|
All Types
|
$15.41
|
|
4
|
Group C – Residential
|
Detached, Semi-Detached, Duplex, Triplex, Townhouse
|
$13.37
|
|
|
|
Multiple Unit Buildings (<5 storeys)
|
$10.71
|
|
5
|
|
Multiple Unit Buildings (≥5 storeys)
|
$8.03
|
|
6
|
|
Motel, Hotel
|
$13.37
|
|
7
|
Group D – Business and Personal Services
|
Shell Only(1)
|
$8.48
|
|
8
|
|
Complete Building (partitioned, finished, mezzanine)
|
$14.44
|
|
9
|
Group E – Mercantile
|
Shell Only(1)
|
$8.48
|
|
10
|
|
Complete Building (partitioned, finished, mezzanine)
|
$13.41
|
|
11
|
Group F – Industrial
|
Shell Only(1)
|
$5.84
|
|
12
|
|
Complete Building (partitioned, finished, mezzanine)
|
$7.76
|
|
13
|
|
Unserviced Storage Building
|
$4.54
|
|
14
|
|
Parking Garage
|
$3.61
|
|
15
|
|
Farm Building
|
$3.61
|
|
16
|
All Occupancies
|
Service Floors
|
$4.13
|
|
|
Section B: Alteration, Repair and Other Structures
|
Item
|
Occupancy Classification
| Work Description |
Multiplier
|
Flat Fee
|
17
|
Group A – Assembly
|
|
$8.25
|
|
18
|
Group B – Institutional
|
|
$6.50
|
|
19
|
Group C – Residential
|
Additional Dwelling Unit
|
$9.09
|
|
20
|
|
Retrofit Accessory Apartment
|
|
$138
|
21
|
|
All other Residential Occupancies
|
$6.73
|
|
22
|
Group D – Business and Personal Services
|
|
$7.32
|
|
23
|
Group E – Mercantile
|
|
$5.30
|
|
24
|
Group F – Industrial
|
|
$4.29
|
|
25
|
Other Structures
|
Accessory Utility Building (garden shed, gazebo)
|
|
$138
|
26
|
|
Below Grade Entrance
|
|
$309
|
27
|
|
Detached or Semi-detached Carport/Garage(2)
|
|
$203
|
|
|
Deck/Platform/Porch (unenclosed)
|
|
$138
|
|
|
Foundation/Unfinished Basement
|
$4.13
|
|
28
|
|
Permanent Tent/Air Supported Structure
|
$4.13
|
|
29
|
|
Retaining Wall (per metre of length or part thereof)
|
$11.35
$803 min.
|
|
30
|
|
Single, Detached Portable Classroom
|
|
$516
|
31
|
|
Temporary Building or Tent(3)
|
|
$516
|
32
|
|
Temporary Sales Structure
|
|
$516
|
|
Section C: Miscellaneous
|
Item
|
Occupancy Classification
| Work Description |
Multiplier
|
Flat Fee
|
33
|
Residential Service Connections
|
Service Connection (per lot)
|
|
$138
|
34
|
Solar Panels
|
Serving Individual Dwellings
|
|
$138
|
35
|
|
Serving all other Buildings
|
|
$448
|
36
|
|
Balcony Guard Replacement/Repair (per metre of length)
|
$1.55
|
|
37
|
|
Electromagnetic Locking Device (each)
|
|
$206/ea.
$803 max.
|
38
|
|
Fireplace/Woodstove
|
|
$138
|
39
|
|
Parking Structure Repair
|
$1.03
|
|
|
Classes of Permits and Permit Fees
|
Item
|
Class of Permit
|
By-law Reference
|
Fee Payable
|
1.
|
Building Permit
|
5.2 Schedule A - Part 2
|
See Schedule ‘B' - Table 2
Minimum fee payable:
Minor Permits - $138
Moderate Permits - $309
Major Permits - $516
|
2.
|
Demolition Permit
|
5.3
|
$0.24 per square metre of floor area
|
3.
|
Permit for a Stage of Construction (Partial Building Permit)
|
5.4
|
An amount equal to 10% of the building permit fee for each phase of construction.
Minimum fee in accordance with Item 1 of this table
Maximum fee is $516
Partial permit fees are non-refundable.
|
4.
|
Conditional Building Permit
|
5.5
|
An amount equal to 10% of the building permit fee.
Minimum fee in accordance with Item 1 of this table
Maximum fee is $1032
Conditional permit fees are non-refundable.
|
5.
|
Change of Use Permit
(No construction proposed)
|
5.6
|
$309 flat fee
|
6.
|
Site Servicing Permit
|
5.7
|
An amount equal to 1.6% of the estimated construction value of the servicing
|
7.
|
Signs Permit (regulated by the Building Code)
|
5.8
|
$258 per sign
|
8.
|
Occupancy Permit for an Unfinished Building
|
8.4
|
$516 flat fee
|
|
Other Fees
|
Item
|
Fee Type
|
By-law Reference
|
Fee Payable
|
9.
|
Resubmission of application previously found to be incomplete.
|
5.10
|
25% of permit fee
|
10.
|
Revision to application or permit
|
8.2
|
$155 per hour
The minimum fee for the review shall be the minimum fee in accordance with Item 1 of this table
|
11.
|
Alternative Solution Examination Fee
|
8.2
|
$155 per hour (minimum 1 hour for houses, and 4 hours for other buildings).
Alternative Solution fees are non-refundable.
|
12.
|
Inspection Fee - Additional
|
8.3
|
$155 per inspection
|
13.
|
Permit Surcharge
|
8.5
|
The greater of:
- Surcharge of 25% of the permit fee when construction has begun and a permit application has been received;
- Surcharge of 50% of permit fee when construction has begun and no permit application has been received, or
- Minimum fee in accordance with Item 1 of this table
|
14. |
Registration and/or Discharge of an Order on/from Title
|
8.6 |
$308 flat fee (each) |
15. |
Transfer of Permit
|
10 |
$138 flat fee |
16. |
Spatial Separation Agreement |
14 |
$308 flat fee |
- Security Deposit may be requested by Engineering Services for residential buildings with excavation works. Please contact EngineeringServices@ajax.ca for further information.
|
Development Charges
|
Development Charges |
|
Building Statement of Activities
|
Statement of Activities report
|
Non-Residential Building Permits
|
The following information is required when submitting a permit application for a non-residential building.
Designer Requirements
|
All construction drawings for the permit application are required to be prepared by a qualified designer, architect, professional engineer, or a combination thereof, depending on the building description and scope of work.
The OBC requires qualified and registered designers who review and take responsibility for design activities to include the following information on any documents submitted to the Chief Building Official:
- The name and building code identification number (BCIN) of the registered firm.
- A statement that the qualified person has reviewed and taken responsibility for the design activities.
- The name and BCIN of the qualified person.
- The signature of the qualified person.
- Completed Schedule 1 – Designer Information form
The OBC specified when a project is required to be designed and reviewed by an architect, professional engineer, or both. When the construction requires an architect and/or professional engineer the person retained is responsible for the following:
- Commitment to General Review by Architect or Professional Engineer form
- Ensure design and construction is in accordance with the performance standards of the Ontario Association of Architects or the Association of Professional Engineers of Ontario.
- Determine whether the construction is in general conformity with the plans, drawings, graphic representations, specifications and other documents, including revisions.
- Provide copies of written reports arising out of the general review to the Chief Building Official.
|
Drawing Requirements
|
Depending on the construction project different permit requirements apply. Refer to the Building Permit Requirements to find out what is needed for the building permit submission.
|
|